Timetabling



Our plan for development is to work through a fairly standard development cycle. A model which includes research, studies and post reflection among other things. To ensure that all of these could be completed correctly within the project timeline we drew up a timetable that that we would try and follow.
Week 1 (Feb7th – Feb 13th)
       Evaluation and Assessment of the Brief
       Research on Board Games in General and Our Specific Game
Week 2 (Feb14th – Feb 20th)
       Presenting of Concept
       Conceptual Design and Initial Ideas
Week 3 (Feb 21st – Feb 27th)
       Academic Research
       Industry Research
       Artistic and Past Project Research
Week 4 (Feb 28th – Mar 6th)
      Prototyping
      Environmental Survey
      Contextual Analysis
Week 5 (Mar 7th – Mar 13th)
      Iteration and development of design
Week 6 (Mar 14th – Mar 19th)
      Presentation of Project
      Evaluation of Product and Team Performance