Our plan for development is to work through a fairly standard development cycle. A model which includes research, studies and post reflection among other things. To ensure that all of these could be completed correctly within the project timeline we drew up a timetable that that we would try and follow.
Week 1 (Feb7th – Feb 13th)
Evaluation and Assessment of the Brief
Research on Board Games in General and Our Specific Game
Evaluation and Assessment of the Brief
Research on Board Games in General and Our Specific Game
Week 2 (Feb14th – Feb 20th)
Presenting of Concept
Conceptual Design and Initial Ideas
Presenting of Concept
Conceptual Design and Initial Ideas
Week 3 (Feb 21st – Feb 27th)
Academic Research
Industry Research
Artistic and Past Project Research
Academic Research
Industry Research
Artistic and Past Project Research
Week 4 (Feb 28th – Mar 6th)
Prototyping
Environmental Survey
Contextual Analysis
Prototyping
Environmental Survey
Contextual Analysis
Week 5 (Mar 7th – Mar 13th)
Iteration and development of design
Iteration and development of design
Week 6 (Mar 14th – Mar 19th)
Presentation of Project
Evaluation of Product and Team Performance
Presentation of Project
Evaluation of Product and Team Performance